HISTORICAL EVENT

Notre-Dame de Paris is substantially completed

Event
1345 CEFranceArchitectureLegacy import · pending source reviewL1 · Structure checked

Volume position: Frankish & Medieval Europe · Ch. 8/8

Locate on the globe ↗Compare civilizations ↗More in this year ↗
This translation predates the current source revision and needs review. Chinese source ↗

In 1345, the main project of Notre Dame de Paris was completed (construction began in 1163).1 This Gothic church is famous for its towering rib arches, flying buttresses and complex carved glass.2 It is the pinnacle of French Gothic art.3

The entry is kept as a concise record of that wider process rather than a standalone narrative.4

Evidence ledger

4 claims0 sourced4 unsourced

Every hard fact in the narrative above is registered here. A claim may also record source-only details that the narrative does not repeat; the related-narrative line points to the corresponding passage, not a guarantee that the source supports every word of the body. A claim without a source stays visibly unsourced.

  1. 1EventUnsourcedL1

    In 1345, the main project of Notre Dame de Paris was completed (construction began in 1163).

    Related narrativeIn 1345, the main project of Notre Dame de Paris was completed (construction began in 1163).

    No source registered. This assertion remains unverified.

    Rebuilt after English expansion; unverified.

  2. 2EventUnsourcedL1

    This Gothic church is famous for its towering rib arches, flying buttresses and complex carved glass.

    Related narrativeThis Gothic church is famous for its towering rib arches, flying buttresses and complex carved glass.

    No source registered. This assertion remains unverified.

    Rebuilt after English expansion; unverified.

  3. 3EventUnsourcedL1

    It is the pinnacle of French Gothic art.

    Related narrativeIt is the pinnacle of French Gothic art.

    No source registered. This assertion remains unverified.

    Rebuilt after English expansion; unverified.

  4. 4EventUnsourcedL1

    The entry is kept as a concise record of that wider process rather than a standalone narrative.

    Related narrativeThe entry is kept as a concise record of that wider process rather than a standalone narrative.

    No source registered. This assertion remains unverified.

    Rebuilt after English expansion; unverified.

Sources and review

Verification level · L1 · Structure checked

English translation predates the current source revision; 4 key claims have no binding source; Unsourced key claims keep the event at structure level

This entry was migrated from the original chronology. Individual references have not yet been supplied. Its imported status is not a claim of historical verification. Review methods

Locations

Content ID:evt-2af39781435266dc
Source file:events/evt-2af39781435266dc/event.md
How to propose a correction ↗
Yuan completes the three official historiesThird Venetian-Genoese War (War of the Straits)